Cable for 7 Locations - Dual Drops at Each
Labor - Cabling
Install Data Line to Conference Room
re-routed cables at michigan first Evergreen locat
Labor
Relocate Current Infrastructure
Install Hardware, Work with Craig to Deploy Softwa
Cable for the Isonas Card Reader, Connect to Devic
Remove Old Cabling and ReCable Specified Areas
Install Cat6 Data Lines for 8 Cameras
Install APs at Breton Location
Configure NVR and Cameras
Install 59 Cameras Throughout the Facility
Replace the Bad Data Lines, Install GFI Plug
Cable Labor - Install and Mount AP at Wayne Branch
Install Support and Cable Tray
Cable Labor
Configure NVR
Service Call - Reconnected PCs to server, Reestabl
Install 2 IP Cameras, Repair Door Strike Wiring
Pre-Pull 235 Cat5E cables for data and 183 Cat5E C
Install (2) Cat6 Backbone